Request for Proposal PW-RFP-006-2026 – Consultant Services – Transit Hub & Community Space

Request for Proposal | PW-RFP-006-2026

Consultant Services – Transit Hub & Community Space

Addendum No. 1 | Closing Deadline Extended
Proposals Close: Tuesday, November 24, 2026
2:00 p.m. local time

Electronic PDF submissions only. This updated deadline supersedes the November 18, 2026 closing date in the original RFP. Late submissions will not be accepted.

The Corporation of the City of Temiskaming Shores is inviting proposals from qualified consulting firms to provide professional engineering, landscape architecture, urban design and associated services for the planning and detailed design of the Downtown New Liskeard Transit Hub and Community Space.

The project will transform an existing gravel parking area in downtown New Liskeard, between Wellington Street South and Armstrong Street South, into a modern, accessible and multifunctional public space. The proposed redevelopment will establish a centralized transit transfer hub while improving parking, pedestrian connections, stormwater management and opportunities for community activities.

Key Dates and Addendum Updates

Follow-up Questions Deadline — Closed
Wednesday, November 11, 2026, at 4:30 p.m. local time
Responses to Follow-up Questions
Scheduled by the end of day Tuesday, November 17, 2026
Extended Proposal Submission Deadline
Tuesday, November 24, 2026, at 2:00 p.m. local time

The original RFP questions deadline was November 6, 2026. Addendum No. 1 provided a further period for follow-up questions, which has also closed.

Addendum No. 1 — Important Clarifications

Issued November 6, 2026. Addendum No. 1 forms part of PW-RFP-006-2026 and changes or clarifies requirements of the original RFP.

All proponents should review the complete addendum and its questions and answers before submitting their proposals. The points below are a summary only; the procurement documents govern.

  • Proposal length: The City requests a maximum 20-page technical proposal, excluding the items identified in the addendum (such as the cover, required forms, fees, schedule, resumes and references).
  • Submission format: One consolidated PDF containing both technical and financial information is permitted.
  • Design scope and phasing: All major project elements, including the proposed Farmers' Market canopy, are to be designed to a tender-ready level; construction may be phased according to funding.
  • Operational readiness: Bus access, passenger loading/unloading areas, accessible pedestrian connections and a functioning shelter are targeted for August 31, 2027. Public washroom construction should be underway but need not be finished by that date.
  • Budget and site information: The approximate $1.75 million construction budget is preliminary and not guaranteed. Proposals should allow for survey-related costs; new geotechnical investigations are not part of the base fee.
  • Fee evaluation: Only the base Consultant Services Fee is included in financial evaluation. Provisional construction administration and inspection services (estimated 250 combined hours) must still be priced separately.

How to Submit

Proposals must be submitted electronically through the City's Electronic Bid Submissions Portal, accessible from the Bid Opportunities page.

  • Submissions must be in PDF format and must not exceed 50 MB. One PDF combining technical and financial components is permitted under Addendum No. 1.
  • The City requests a technical proposal of no more than 20 pages, subject to the exclusions listed in Addendum No. 1.
  • Subject Line: PW-RFP-006-2026 "Consultant Services – Transit Hub & Community Space"
  • Addressed to: Logan Belanger, Clerk
  • Required proposal forms must be completed and signed.
  • Proponents will receive an automatic email confirming receipt of their submission.
  • Proposals submitted by fax, mail or email directly to City staff will not be accepted.
  • Late or partial proposals will not be accepted.

Proponents are responsible for ensuring that their submissions are received before the closing deadline and should allow sufficient time to complete the electronic submission process.

Submission Confirmation Assistance

If an automatic confirmation email is not received, contact the Municipal Clerk at 705-672-3363 ext. 4136 or clerk@temiskamingshores.ca.

Project Overview

The City is advancing transit improvements through the Ontario Transit Investment Fund (OTIF), including the development of a new downtown transit hub in New Liskeard to support local and regional transit connections.

The project site is an existing municipal gravel parking area located between Wellington Street South and Armstrong Street South, south of Whitewood Avenue.

The City is seeking an integrated design that balances transit operations, accessible public parking, pedestrian circulation, community gathering opportunities, environmental sustainability and long-term municipal maintenance requirements.

The successful Proponent will develop alternative concepts, prepare and facilitate public consultation materials and presentations in coordination with the City, complete preliminary and detailed designs, provide construction cost estimates and produce tender-ready construction documents.

Scope of Work Highlights

The consulting assignment includes the following principal components:

  • Existing Conditions and Site Assessment: Review site conditions, property information, surveys, utility infrastructure, drainage, accessibility, the existing EV charging infrastructure (which must remain in its current location) and potential regulatory constraints.
  • Site Planning and Urban Design: Develop a coordinated site layout incorporating transit operations, public parking, pedestrian connections, landscaping, public amenities, safety and winter maintenance considerations.
  • Transit Hub Design: Plan an accessible passenger waiting shelter (with partially enclosed or open-air options preferred), two self-contained, universally accessible public washrooms within one structure, boarding areas, transit information, site lighting and security-minded design.
  • Transit Circulation and Parking: Assess transit vehicle movements, loading and unloading areas, accessible parking, public vehicle circulation and reconstruction of the existing gravel parking area.
  • Stormwater Management: Evaluate site drainage, grading, storm sewer infrastructure and feasible low-impact development solutions, including permeable surfaces, bioswales and rain gardens.
  • Community Event Space: Develop flexible public gathering areas and a proposed covered Farmers' Market canopy to a tender-ready design level, allowing for possible phased construction.
  • Municipal Servicing and Electrical Design: Address water and sanitary connections, drainage, electrical servicing, lighting, communications infrastructure and future technology provisions.
  • Concept Development and Public Consultation: Prepare at least two design alternatives, presentation materials and bilingual documentation as coordinated with the City, facilitate one Public Information Centre and document feedback. The City will coordinate the venue, public notices and general communications.
  • Detailed Design and Tender Preparation: Prepare engineering and design drawings, specifications, cost estimates, supporting documentation and construction tender packages.
  • Regulatory Approvals: Identify required permits and approvals and assist the City with the applicable approval processes.

Proposed Infrastructure and Design Deliverables

The proposed development is anticipated to incorporate or evaluate:

  • Accessible passenger waiting shelter and seating, preferably partially enclosed or open-air.
  • Two self-contained, universally accessible public washrooms integrated into one structure, suitable for year-round operation.
  • Electronic transit information displays and route information provisions.
  • Dedicated transit vehicle circulation and accessible boarding areas.
  • Hard-surfaced public parking and accessible pedestrian routes.
  • Exterior lighting, landscaping and public seating.
  • Stormwater drainage and potential sustainable infrastructure.
  • Covered Farmers' Market canopy and community gathering space, fully designed for tendering even if construction is deferred.
  • Electrical servicing, utility coordination and future technology provisions.

Required consulting deliverables include:

  • Project work plan, schedule and existing conditions assessment.
  • Minimum two concept designs and preliminary construction cost estimates.
  • Public Information Centre materials and consultation summary.
  • 60% preliminary design submission.
  • 90% detailed design submission for City review.
  • 100% final sealed drawings, specifications, quantities and construction cost estimate.
  • Construction tender documents and technical procurement assistance.
  • Recommended construction phasing and cost-saving opportunities.

Public-facing consultation materials must be available in both English and French, as coordinated with the City. A provisional fee for construction administration and part-time inspection services, based on an estimated 250 combined hours, must be provided separately and is excluded from the financial evaluation of base consultant fees.

Project Schedule Requirements

The City intends to advance the project on an accelerated schedule to support a proposed transit service implementation date of September 13, 2027. The anticipated milestones are:

Project Milestone Target Date
Consultant selection and project initiation December 2026
Existing conditions review and conceptual design December 2026 – January 2027
Public information session and preferred concept selection February 2027
Preliminary and detailed design February – April 2027
Final construction drawings and tender documents April 30, 2027
Construction tendering and award May – June 2027
Anticipated construction commencement July 1, 2027
Transit infrastructure operational readiness August 31, 2027
Proposed transit service implementation September 13, 2027

Proponents must demonstrate their ability to meet the accelerated project schedule, including transit operational readiness by August 31, 2027. The minimum operational scope by that date includes bus access, passenger loading and unloading, accessible pedestrian connections and a functioning transit shelter. Public washroom construction should be underway but does not have to be complete by that milestone; other community space work may be phased.

Proposal Evaluation Overview

Proposals will be evaluated based on the overall best value to the City using the following criteria:

Evaluation Criteria Weight
Qualifications and Relevant Experience 20%
Project Understanding and Design Approach 25%
Project Schedule and Delivery 20%
Fees and Disbursements 30%
Value-Added Services and Innovation 5%
Total 100%

The City is not obligated to accept the lowest-priced proposal. Selection will be based on the overall evaluation and the Proponent's demonstrated ability to provide the best value. Addendum No. 1 confirms that only the base Consultant Services Fee is included in the financial evaluation; separately priced provisional construction administration and inspection fees are not included.

Important Notes and Compliance Requirements

  • Required Forms: Proposals must include the Form of Proposal, Non-Collusion Affidavit, Conflict of Interest Declaration and AODA Compliance Agreement.
  • Insurance: The successful Proponent must provide evidence of Commercial General Liability insurance with coverage of no less than $5,000,000 per occurrence, within 10 days of notification of acceptance and before work begins.
  • WSIB: The successful Proponent must provide a Workplace Safety and Insurance Board Certificate of Good Standing within 10 days of notification of acceptance and before work begins.
  • Accessibility: Proponents must comply with applicable requirements of the Accessibility for Ontarians with Disabilities Act, 2005. Addendum No. 1 clarifies that references to Ontario Regulation 429/07 are replaced with Ontario Regulation 191/11, as amended.
  • Buy Ontario: Proponents must comply with applicable requirements of the Buy Ontario Act (Public Sector Procurement), 2025, and associated Municipal Buy Ontario Procurement Directive.
  • Professional Qualifications: Engineering drawings requiring professional certification must be sealed by an appropriately licensed Professional Engineer in Ontario.
  • Fee Proposal: Proponents must provide a detailed upset-limit consulting fee proposal, exclusive of HST, with provisional construction administration and inspection fees identified separately.
  • Proposal Validity: Proposals must remain valid for 30 days from the submission date.
  • Addenda: Proponents are responsible for reviewing and acknowledging Addendum No. 1 and any other addenda issued by the City.
Important Submission Notice

Proponents should review the complete Request for Proposal, including all specifications, required forms, submission conditions and any addenda, before preparing and submitting their proposals.

Questions and Contact Information

The designated contact for questions about the RFP specifications is:

Mitch McCrank, CET, PMP, CRS
Director of Transportation Services
City of Temiskaming Shores
325 Farr Drive, Temiskaming Shores, ON P0J 1K0
Phone: 705-672-3363 ext. 4113

The questions period has closed. The original deadline was November 6, 2026, at 2:00 p.m. Addendum No. 1 permitted follow-up questions until November 11, 2026, at 4:30 p.m., with responses planned by the end of day November 17, 2026. Proponents should consult the full procurement documents and published addenda for official clarifications.

Interested in Submitting a Proposal?

Review the complete RFP, Addendum No. 1 and any other published addenda before submitting electronically. The revised closing deadline is November 24, 2026, at 2:00 p.m. local time.


Procurement Reference: PW-RFP-006-2026

Sign up to our Newsletter

Stay up to date on the city's activities, events, programs and operations by subscribing to our eNewsletters.